Jebel Ali Dubai

Customer

Cobra – Tecton

Country

Dubai

Year

2017

Category

Bidding

Description

SWRO PLANT IN JEBEL ALI POWER STATION (DUBAI)

Production capacity

181.824 m3/d

Characteristics

Treatment line formed by; Seawater convey from intake tower to intake basin, Seawater Intake, bar and travelling band screening and Pumping Station, Civil works of the future extension Station K Phase 3 Stage 2 Power Plant intake, Chlorination of the Intake Tower & or Intake Basin, Clarification by Dissolved Air Flotation (DAF), Filtration by Gravity Dual Media Filters, Filtered water tank and pumping, Cartridge filter, Chemical pre-treatment, Reverse Osmosis, Post-treatment (Carbon dioxide dosing, Limestone filtration, Magnesium sulphate dosing, Sodium hydroxide dosing, Final disinfection), Product water storage, Product water pumping station, Treatment of effluents, Brine and effluents discharge, Auxiliary facilities, Electrical installation, Control system.

Scope

  •  Vendors/Manufacturer’s Record and Equipment Lifetime and Attachments.
  • Tenderers detailed description of the scope of Works proposed for this Tender.
  • Tender Technical Schedules and Data Sheets.
  • List of Tenderers’ Drawing.
  • Complete set of Technical information, description data and literature, etc. As required to allow verification of proposed works and related fill-in data.
  • Detail Price Schedule.
  • Performance Guarantee and Penalties.
  • Tenderer’s Drawings.