Taweelah Abu Dhabi

Customer

Orascom Construction – Samsung Engineering – Cobra

Country

Abu Dhabi

Year

2018

Category

Bidding

Description

TAWEELAH INDEPENDENT WATER PROJECT (ABU DHABI)

Production capacity

909.218 m3/d

Characteristics

Treatment line formed by; Seawater intake cannel, Seawater Intake, bar and travelling band screening and Pumping Station, Chlorination of the Intake Basin, Clarification by Dissolved Air Flotation (DAF), Filtration by Gravity Dual Media Filters, Filtered water tank and pumping, Cartridge filter, Chemical pre-treatment, Reverse Osmosis (First & Second Pass: RO-1 & RO-2), Post-treatment (Carbon dioxide dosing, Limestone filtration, Final disinfection), Buffer Product water storage tanks, Product water pumping station, Potable Water Storage Farm, Treatment of effluents, Brine and effluents discharge, Auxiliary facilities, Electrical installation, Control system.

 

Scope

  • Standards, codes and regulations.
  • Description of major equipment and systems.
  • Electrical equipment and systems.
  • Instrumentation and control systems.
  • Civil works.
  • Unified vendor list covering all EPC vendors.
  • Project drawings and diagrams.
  • Environmental Data and Aspects.