Customer
Aqualia
Country
Panama
Year
2016
Category
Bidding
Description
STUDY, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF THE POTABILIZATION PLANT OF LA ARENOSA
Production capacity
227.124 m3/d
Characteristics
Water line formed by; Arrival work. Flow meter chamber, Pre-zonation chamber, Rapid mixing. Static Mixer, Coagulant Dosing (Alumina Sulfate), Oxidant Dosing (Chlorine gas), pH Regulator Dosing (Calcium Hydroxide), 3-Stage Hydraulic Flocculation Chamber, Dissolved Air Flotation (DAF), Sand Filtration mixed sand / anthracite bed, Recovery of washing water, Contact chamber, Dosing of oxidant for disinfection (Chlorine gas), Dosing of sodium silicofluoride, Treated water storage tanks, Treated water outlet box. Flowmeter.
Sludge line formed by; Sludge tank, Dehydration of sludge using centrifuges, Chemical conditioning of sludge to be dehydrated, Storage of dehydrated sludge in silo.
Scope
- Descriptive memory
- Sizing of the process.
- Hydraulic calculations.
- Electrical calculations.
- Automation and control.
- Fire protection.
- Air conditioning and ventilation system. (HVAC)
- Structural calculations.
- Blueprints
- Technical specifications of mechanical equipment, electrical equipment, automation and control
- Budgets