Customer
Tedagua
Country
Singapore
Year
2016
Category
Bidding
Description
DESALINATION PLANT AT MARINA EAST DESIGN-BUILD-OWN-OPERATE PROJECT (SINGAPORE)
Production capacity
137.000 m3/d
Characteristics
Treatment line formed by; Seawater Intake, Seawater Screening and Pumping Station, Intake Chlorination, Clarification by Dissolved Air Flotation (DAF), Self-cleaning Strainers, Membrane Filtration (MF/UF), RO Feed Storage and pumping, Cartridge Filters, Pre-treatment chemicals, Reverse Osmosis 1st pass, Reverse Osmosis 2nd pass, Chlorine contact tank, Post-treatment chemicals, Treated water storage, Treated water pump station, Waste Neutralization, Wastewater Disposal, Outfall System, Process Overflow and Drainage System, Ancillary systems and utilities, Electrical installation, Control system.
Scope
- Treatment process design conforming with the specified requirements for the Base Bid.
- Description of how the proposed design will result in Product Water flow and quality being delivered efficiently over the defined operating range.
- Description of the plant and process operations under both modes of operation, i.e. treatment of Reservoir Water and seawater.
- Process and instrumentation diagrams for the main treatment.
- Process flow diagram.
- Details of the chlorination facilities including, feed stock quality, generation plant and storage facilities.
- Quantities and concentrations of all relevant constituents of each of the waste streams.
- General arrangement drawings of the Plant.
- Active and passive emergency overflow provisions for all potential sources of overflow.
- Nomination of major process equipment, vendor information, specifications, data sheets, operating philosophies, materials of construction, and delivery time frames.
- Description of major pipework systems.
- Precise details of all Product Water quantity and quality monitoring instruments.
- Nomination of the instrumentation and control system integrator.
- Details of the control system, including system architecture schematic.
- Details of the transfer of signals to the PUB control center at Woodleigh.
- A statement of chemical and electricity consumption guarantees accompanied by basis for the development of guarantees.
- List of standards, codes, regulations.